126.00 mm [LOD 400 ARCHITECTURAL LOCKUP]37.80 mmISO-19650-2 // DIGITAL TWINREF: DH-BIM-SK01 · SCALE 1:1

Double H BIM Services

Clients & Partners Delivering Coordinated BIM

Clients & Developers

  • AD Ports Group
  • Aldar Properties
  • Al Ghurair

Main Contractors

  • Alcotra Contracting & Trading
  • Freiburg Built With Precision

Consultants

  • National Engineering Bureau (NEB)
  • AMG Al Amar Consulting
  • SDV Consulting Engineers
  • OBERMEYER Middle East
  • Khatib & Alami

From Idea to Building Layer by Layer

05 / 05

Coordinated Model

Five Disciplines. One Coordinated Model. All layers resolved against the same grid, collapsed into a single federated model.

Tap a discipline to take it out of the model.

  1. 01

    Architectural

    Walls, partitions, doors, room tags and dimension strings set out on the floor plan.

    • Walls and envelope. Exterior walls and partitions set the building's limits.
    • Corridor and doors. A central corridor links every room through set openings.
    • Rooms and dimensions. Each space is named and dimensioned on the plan.
  2. 02

    Structural

    Columns, beams, slabs and foundations set out on the same grid as the architectural plan.

    • Columns. On every grid intersection, floor after floor.
    • Beams. Spanning column to column along the gridlines.
    • Slabs. One floor plate per level on the same structural grid.
  3. 03

    Mechanical

    Air handling unit and main ducts drawn from the riser along the corridor ceiling, with branches to diffusers.

    • Air handling unit. Where conditioned air starts its route.
    • Main duct. Runs along the corridor ceiling from the riser.
    • Branches and diffusers. Branches carry the air into each room.
  4. 04

    Electrical

    Switchboard, cable trays running parallel to the corridor, and lighting rows across the rooms.

    • Switchboard. The floor's power distribution starts here.
    • Cable trays. Run parallel to the corridor to the end of the floor.
    • Lighting rows. Spaced evenly across the rooms.
  5. 05

    Plumbing

    Supply and drainage risers in the wet rooms, with fixture connections and valve symbols.

    • Supply and drainage risers. Stacked so they align from floor to floor.
    • Fixture connections. Branch lines reach every fixture.
    • Valves. Marked where the network is controlled.

Five Disciplines. One Coordinated Model. All layers resolved against the same grid.

Services

What we deliver

  1. 01

    BIM Modeling: Architectural, Structural & MEP

    Coordinated, information-rich models for each discipline, built to the level of development your project stage requires.

    See modeling scope
  2. 02

    Clash Detection & Coordination

    We federate discipline models, identify conflicts between systems, and track resolutions with the design team before they reach site.

    Discuss coordination
  3. 03

    Shop Drawings & As-Built Drawings

    Fabrication-ready shop drawings and documentation that reflects what was installed, derived from the coordinated model.

    Request drawing support
  4. 04

    BIM Implementation & Consultancy

    Support for BIM execution planning, standards, and workflows so project teams share information consistently.

    Talk to a consultant

BIM Dimensions

The dimensions of a BIM scope.

These dimensions describe Double H's service framework. Definitions of BIM 'dimensions' vary between markets and standards, and each is delivered according to the agreed scope of work.

  1. Traditional CAD drawings, including plans, sections, and elevations. Primarily drawing-based deliverables without integrated BIM data coordination.

    Inputs / dependenciesLines and text only; no embedded object information. Contrasts with a coordinated BIM workflow.

Not every dimension is included in every engagement. Ask us which dimensions suit your project.

Discuss your scope
2D01 / 08Drafting

Level of Development

LOD 100 to 500.

What LOD is

LOD describes how developed a model element is and how far the team can rely on it at each stage. Each element progresses on its own.

What LOD is not

  • LOD describes how developed and reliable an element is, not its visual detail.
  • LOD 500 means field-verified conditions, not a more detailed LOD 400.
  • We follow the LOD framework agreed for your project, such as BIMForum.
Discuss the LOD your project needs
LOD 100

Conceptual

Overall concept with approximate quantities and area.

Geometry
Mass or symbol; size and position indicative only
Information
Area, volume, orientation, early cost/m²
Typical use
Feasibility, massing, early estimates
Reliability

About Double H

A BIM partner built around coordination.

11completed projects published to date.

Our Mission

To deliver accurate, high-quality BIM solutions that help clients achieve project goals with greater efficiency and confidence. Through advanced modeling, coordinated workflows, and close collaboration, we reduce coordination risks and deliver reliable, value-driven results tailored to each project.

Our Vision

To become a trusted international BIM partner, advancing construction delivery through innovative digital workflows, technical excellence, and seamless multidisciplinary collaboration.

Values

  1. Excellence
  2. Collaboration
  3. Client Focus
  4. Innovation
  5. Reliability
  6. Integrity

Why choose us

  • Faster, Better-Coordinated Project Delivery

    One coordinated information set reduces the back-and-forth between disciplines.

  • Technical Expertise You Can Trust

    Models are built and checked by people who understand how the building goes together.

  • Seamless Multidisciplinary Coordination

    Architecture, structure and MEP are resolved against each other, not in isolation.

  • High-Precision Deliverables

    Drawings and data are derived from the model, with a traceable review trail.

  • Client-Centered Solutions

    The scope follows your project stage and information requirements.

  • A Reliable Long-Term Partnership

    A consistent team and a documented process from first model to as-built record.

  1. Religious · Abu Dhabi, UAE

    MBZ Mosque

    View project
  2. Religious · Al Ain, UAE

    Alnoud Mosque

    View project
  3. Security · Abu Dhabi, UAE

    K9 Security

    View project
  4. Sports · Abu Dhabi, UAE

    Abu Dhabi Turf Club

    View project
  5. Hospitality · Abu Dhabi, UAE

    LAM Tower / Al Andalus Hotel

    View project

Selected Work

Projects, coordinated end to end.

Global Presence

Working across the region.

Double H operates from two bases, supporting projects across the Levant and the Gulf.

  • DamascusSyria
  • Abu DhabiUnited Arab Emirates

Let's Coordinate Your Next Project.

Tell us about your project, required disciplines, and BIM deliverables. Our team will get in touch to discuss the next steps.